Hub assembly line production visibility
Connect station cycles, model context, operator actions and quality checks without moving deterministic machine control into the MES.
Operational problem
Supervisors lack one timeline for station status, cycle loss, output and blocked work.
System pattern
PLC event mapping, edge collection, station model, live Andon view and structured downtime reasons.
Decision enabled
Teams can separate machine loss, material wait, quality hold and planned changeover.